Installing new culverts 6/9/08 |
Installing new culverts 6/9/08 |
|
|
Clearing the dock drivewayt area 6/9/08 |
Making room for new culverts 6/9/08 |
|
|
Installing floor drain in new ware wash room 3/29/08 |
Doors & lighting installed on new dock 3/29/08 |
|
|
| New packaging machine installed
in new packing room 3/29/08 |
Temporary wall installed for demolition
of existing freezer 3/29/08 |
|
|
1st time a forklift enters new dock area 3/29/08 |
1st palette of food entering new freezer 3/29/08 |
|
|
Aerial View of Plant 3/27/2008 |
Aerial View of Plant 3/27/2008 |
|
|
Preparing for loading dock slab 2/25/08 |
Preparing for loading dock slab 2/25/08 |
|
|
Palette racks installed in blast freezer 2/25/08 |
Palette racks installed in cold storage area 2/25/08
|
|
|
Installing transformers 2/25/08 |
Filling ammonia tanks 2/25/08 |
|
|
Aerial View of Plant 2/13/2008 |
Aerial View of Plant 2/13/2008 |
|
 |
Insulated Ammonia lines in refrigeration plant 1/31/08 |
Two 20 ton blast freezer doors being installed 1/31/08 |
|
|
Freezer Palette Racks being installed 1/31/08 |
Ammonia compressor in refrigeration plant 1/31/08 |
 |
 |
Installing Refrigeration Lines 1/10/2008 |
Installing Refrigeration Lines 1/10/2008
|
|
|
Rear Aerial View of Plant 1/4/2008 |
Front Aerial View of Plant 1/4/2008 |
|
|
Roof installation nearing completion |
Roof installation complete |
|
|
Wall installation complete |
Preparing for roof installation |
|
|
Installing walls on packaging & prep room |
Installing walls on packaging & prep room |
|
|
Blast room condensors installed 11/06/07 |
refridgerated dock area complete 11/06/07 |
|
|
Piping of ammonia compressor plant nearing completion |
Twin -40 degree blast freezer room |
|
|
Framing complete for packaging and prep rooms |
Piping of ammonia compressor plant nearing completion |
|
|
Blast freezer condensing units being installed 11/29/07 |
Framing complete for packaging and prep rooms |
|
|
Piping ammonia comperssors 11/29/07 |
Electrical room taking shape 11/29/07 |
|
|
Framing new Prep & Packaging room 11/29/07 |
Construction at a glance 11/29/07 |
|
|
Ammonia tank in place 11/16/07 |
Installation of packaging room's 1st beam 11/16/07 |
|
|
Lifting ammonia tank to the top of the building 11/14/07 |
Getting the ammonia tank in place 11/14/07 |
|
|
Installing 1st condensing unit 11/14/07 |
Hooking Ammonia tank to crane 11/14/07 |
|
|
installing roof mounted cooling tower over ammonia plant |
Blast condensing unit ready for installation 11/14/07 |
|
|
Blast condensing unit for freezer 11/14/07 |
Blast condensing unit for main freezer 11/14/07 |
|
|
View from shipping & receiving bridge 11/14/07 |
Crane for ammonia tank installation 11/14/07 |
|
|
Blast freezer condensing unit arrives 11/14/07 |
Packaging building arrives 11/14/07 |
|
|
Steel column protection for electric doors 10/18/07 |
Shipping & Receiving offices over dock area 10/18/07 |
|
|
Addition of Ammonia Plant 10/18/07 |
Skeleton for four 40,000 lb. blast cells 10/18/07 |
|
|
Refridgeration compressors arrive 10/18/07 |
Ammonia plant 10/18/07 |
|
|
3' tall 1 1/2' wide curb for better protection 10/11/07 |
Shipping & receiving office above dock 10/11/07 |
|
|
Electrical equipment arriving 10/10/07 |
Electrical circuit boxes 10/10/07 |
|
|
Pouring slab 10/3/07 |
Finishing concrete 10/3/07 |
|
|
Working on the drains 10/3/07 |
Ready for concrete 10/3/07 |
|
|
Installing Freezer Walls 9/20/07 |
View of the roof 9/20/07 |
|
|
Walls with supports 9/17/07 |
Installing Freezer Walls 9/20/07 |
|
|
Forming concrete walls 9/15/07 |
Erecting concrete walls 9/17/07 |
|
|
Construction Moves Forward 8/24/07 |
Construction Moves Forward 8/24/07 |
|
|
Construction Moves Forward 8/24/07 |
Construction Moves Forward 8/24/07 |
|
|
Pouring Concrete in the Dock Area 8/24/07 |
Pouring Concrete in the Dock Area 8/24/07 |
|
|
Installing the First of the Freezer Panels 08/20/07 |
Installing the Frst of the Freezer Panels 08/20/07 |
|
|
Getting ready to Pouring Concrete in the Dock Area 08/20/07 |
Getting ready to Pouring Concrete in the Dock Area 08/20/07 |
|
|
08/13/07 Aerial photo |
08/13/07 Aerial photo |
|
|
Forming Dock Area 08/13/07 |
Forming Dock Area 08/13/07 |
|
|
Construction Moves Forward 08/13/07 |
Forming Dock Area 08/13/07 |
|
|
The Freezer takes shape 08/07/07 |
The Freezer takes shape 08/07/07 |
|
 |
Erecting Steel 07/30/07 |
Erecting Steel 07/30/07 |
|
|
Loading Dock Prepare 7/25/07 |
Loading Dock Prepare 7/25/07 |
|
|
Loading Dock Prepare 7/25/07 |
Loading Dock Prepare 7/25/07 |
|
|
07/19/07 Second freezer slab pour |
07/19/07 Steel erection continues |
|
|
07/18/07 Aerial photo |
07/18/07 Aerial photo |
|
|
1st. day of erecting steel 07/11/07 |
1st. day of erecting steel 07/11/07 |
|
|
| First steel for building arrives 07/09/07 |
First steel for building arrives 07/09/07 |
|
|
Early July rain slows construction 07/07/07 |
Early July rain slows construction 07/07/07 |
|
|
07/02/07 |
07/02/07 |
|
|
07/02/07 |
07/02/07 |
|
|
06/26/07 Aerial photo |
06/26/07 Aerial photo |
|
|
Covering the new freezer slab for curing 06/15/07 |
Covering the new freezer slab for curing 06/15/07 |
|
|
Louisiana's Largest Concrete Pumping Truck-06/15/07 |
Pouring Concrete for freezer 06/15/07 |
|
|
Left to right:
J.T. Livaccari - Project Superintendent - Brice Building
Casey Smithhart - Vice President of Manufacturing - CJF
Richard "Moo" Mouille - Foreman - Brice Building
|
Pouring Concrete 06/15/07 |
|
|
Installing Reinforcing Steel in Concrete Slab 06/13/07 |
Installing Reinforcing Steel in Concrete Slab 06/13/07 |
|
|
Preparing foundation for concrete 06/12/07 |
Preparing foundation for concrete 06/12/07 |
|
|
Mechanical Room Pouring Concrete -1 st Pour 06/02/07 |
Mechanical Room Pouring Concrete -1 st Pour 06/02/07 |
|
|
05/26/07 Floor Vent Pipe to Fan |
05/26/07 Floor Vent Pipe Header |
|
|
05/26/07 Concrete Pile Cap |
05/26/07 Grade Beam |
|
|
05/23/07 Pumping Concrete by Remote Control |
05/23/07 Concrete Pumper |
|
|
5/22/07 Pouring Concrete in Grade Beams |
5/22/07 Pouring Pile Caps in Mechanical Room |
|
|
05/16/07 Aerial photo-Final Piles Being Driven |
05/16/07 Aerial photo-Final Piles Being Driven |
|
|
5/11/07 Relocating Blast Freezer A/C Units |
5/11/07 Installing Electrical Room Conduit |
|
|
5/11/07 Reinforcement Steel for Grade Beams |
5/11/07 Forming Grade Beams |
|
|
05/02/07 First piling Dairy Building |
05/02/07 First piling Dairy Building |
|
|
04/24/07 started pumping concrete into the composite pilings |
04/24/07 started pumping concrete into the composite pilings |
|
|
04/21/07 600 of 700 Piling in Place |
04/13/07 Aerial photo |
|
|
04/18/07 Ground Breaking |
04/18/07 Ground Breaking |
|
|
|
04/09/07 Day
4 100 Piles Driven |
04/05/07 Marking Piling Position |
|
|
| 04/04/07 Day 1 First of 700 Piles to Drive |
04/03/07 First pilings being unloaded |
|
|
03/23/07 Aerial photo |
03/23/07 Aerial photo |
|
|
03/22/07 Last Day of Fill |
03/22/07 Last Day of Fill |
|
|
3/20/07 First truckload of fill |
3/20/07 Fill |
|
|
3/20/07 Grubbing the property |
3/20/07 Grubbing the property |
|
|
3/5/07 Exposing existing utilities |
3/5/07 Exposing existing utilities |
|
|
From left to right: Melissa Folse, Pat Descant with Brice Construction, and John sign the contract for the new plant expansion 2/19/07 |
From left to right: Melissa Folse, Pat Descant with Brice Construction, and John sign the contract for the new plant expansion 2/19/07 |